While this submission is a draft, it cannot be used by other submissions.

Results of The Scheduling Zoo, serial batching problems

Lax434175.ZooSerialBatchingResults · concepts/Lax434175/ZooSerialBatchingResults.lean · lax-434175

definition

Loading review…

Sign in with ORCID

Community review

Flags

Each flag is tied to a public ORCID identity and explains why this concept may be incorrect.

No flags have been submitted.

    Community review

    Flag this concept

    State precisely what appears incorrect. This explanation will be public under your ORCID name.

    No source line selected.

    Natural Language Statement

    Definition

    The 33 results of The Scheduling Zoo on its serial batching problems that are stated here, each as a proposition about a reading of the problem (Results.PReadingResults.PReading; for a family, Results.ReadingResults.Reading at the problem's specification): its words of instances and schedules and what an online scheduler sees. Each names its source; where the proposition is weaker than the wording, a note says what is left out.

    Concept map
    60 concepts
    100%
    Conjunctive normal formAssembling problems from fieldsOne family for serial and parallel batchingBatching problems in three-field notationBatch scheduling on a single machineCommunication delaysBounds on the number of machines and jobsDeadlinesForbidden times and input encodingsInterruption as a field of parallel-machineschedulingScheduling kernelsMaximizing the minimum machine loadMachine sets and multiprocessor tasksConstraint modules and objectivesNon-preemptive scheduling on parallelmachinesCompletion-time objectivesOnline scheduling as a gameScheduling with operationsOne family for parallel machines and shopsOne family for parallel machines with andwithout preemptionParallel machinesProblems on parallel machines in three-fieldnotationParameters along embeddingsPrecedence constraints and time lagsPreemptive scheduling on parallel machinesPreemptive shop problems in three-fieldnotationPreemptive shop schedulingOptimization problems and embeddingsSingle-machine scheduling with rejectionRelease datesPreemption with restarts on parallelmachinesParameters of the zoo's resultsThe kinds of results on scheduling problemsA single server with setup timesNo-idle shops and batch setup timesOne family for shops with and withoutpreemptionShop problems in three-field notationShop schedulingThreshold reductions between objectivesTransportation delays and a transport robotScheduling problems as parameterizedproblems on wordsParameters of scheduling problemsThe Scheduling Zoo, serial batchingproblemsResults of The Scheduling Zoo, serialbatching problemsBinary encoding of an input and a certificateThe complexity class NPThe complexity class PFixed-Parameter Time on the Word RAMFPT-Reductions, FPT, Hardness andCompletenessFinite Relational StructuresFirst-Order Formulas and the Classes Σ_tand Π_tModel Checking and Weighted FaginDefinabilityThe W-Hierarchy and the A-HierarchyNP-Hardness of a Problem on Words ofNumbersBinary encoding of finite wordsPolynomial-time computation by a wordRAMPolynomial-time computation by a TuringmachineThe word RAMComputing a function within a time boundParameterized Problems andFPT-Reductions on a Word RAM
    Proven claimDefinitionThis conceptRelated conceptA → B: B builds on A

    Lean source view on GitHub

    1import Lax434175.ZooSerialBatching
    2import Lax434175.Results
    3import Lax434175.ResultParameters
    4
    5/-!
    6---
    7title: Results of The Scheduling Zoo, serial batching problems
    8type: definition
    9---
    10The 33 results of The Scheduling Zoo on its serial batching problems that are
    11stated here, each as a proposition about a reading of the problem
    12(`Results.PReading`; for a family, `Results.Reading` at the problem's
    13specification): its words of instances and schedules and what an online
    14scheduler sees. Each names its source; where the proposition is weaker than
    15the wording, a note says what is left out.
    16-/
    17
    18namespace Lax434175.ZooSerialBatchingResults
    19open Lax434175 Lax434175.Problems Lax434175.Results Lax434175.ResultParameters Lax434175.ZooSerialBatching
    20
    21/-- `1|prec;pj=p;s-batch|ΣCj`: is in P.
    22
    23Albers, S. and Brucker, P. (1993). The complexity of one-machine batching problems. https://doi.org/10.1016/0166-218x(93)90085-3
    24-/
    25def p0_r0 (R : Reading F) : Prop :=
    26 InP (R.at p0)
    27
    28/-- `1|pj=p;s-batch|ΣwjCj`: is in P.
    29
    30Albers, S. and Brucker, P. (1993). The complexity of one-machine batching problems. https://doi.org/10.1016/0166-218x(93)90085-3
    31-/
    32def p1_r0 (R : Reading F) : Prop :=
    33 InP (R.at p1)
    34
    35/-- `1|chains;s-batch|ΣCj`: is NP-hard.
    36
    37Albers, S. and Brucker, P. (1993). The complexity of one-machine batching problems. https://doi.org/10.1016/0166-218x(93)90085-3
    38-/
    39def p2_r0 (R : Reading F) : Prop :=
    40 NPHard (R.at p2)
    41
    42/-- `1|chains;pj=1;s-batch|ΣwjCj`: is strongly NP-hard.
    43
    44Albers, S. and Brucker, P. (1993). The complexity of one-machine batching problems. https://doi.org/10.1016/0166-218x(93)90085-3
    45-/
    46def p3_r0 (R : Reading F) : Prop :=
    47 StronglyNPHard (R.at p3)
    48
    49/-- `1|s-batch|ΣwjCj`: is strongly NP-hard.
    50
    51Albers, S. and Brucker, P. (1993). The complexity of one-machine batching problems. https://doi.org/10.1016/0166-218x(93)90085-3
    52-/
    53def p4_r0 (R : Reading F) : Prop :=
    54 StronglyNPHard (R.at p4)
    55
    56/-- `1|pj=p;s-batch;rj|ΣwjCj`: is in P.
    57
    58Baptiste, P. (2000). Batching identical jobs. https://doi.org/10.1007/s001860000088
    59-/
    60def p5_r0 (R : Reading F) : Prop :=
    61 InP (R.at p5)
    62
    63/-- `1|pj=p;s-batch;rj|ΣwjUj`: is in P.
    64
    65Baptiste, P. (2000). Batching identical jobs. https://doi.org/10.1007/s001860000088
    66-/
    67def p6_r0 (R : Reading F) : Prop :=
    68 InP (R.at p6)
    69
    70/-- `1|pj=p;s-batch;rj|ΣTj`: is in P.
    71
    72Baptiste, P. (2000). Batching identical jobs. https://doi.org/10.1007/s001860000088
    73-/
    74def p7_r0 (R : Reading F) : Prop :=
    75 InP (R.at p7)
    76
    77/-- `1|s-batch|ΣTj`: is in Ppseudo.
    78
    79Baptiste, P. and Jouglet, A. (2001). On minimizing total tardiness in a serial batching problem. https://doi.org/10.1051/ro:2001105
    80-/
    81def p8_r0 (R : Reading F) : Prop :=
    82 PseudoPoly (R.at p8)
    83
    84/-- `1|s-batch|ΣTj`: is NP-hard.
    85
    86Du, J. and Leung, J.Y.-T. (1990). Minimizing total tardiness on one machine is NP-hard. https://doi.org/10.1287/moor.15.3.483
    87-/
    88def p8_r1 (R : Reading F) : Prop :=
    89 NPHard (R.at p8)
    90
    91/-- `1|s-batch|ΣUj`: is in P.
    92
    93Brucker, P. and Kovalyov, M.Y. (1996). Single machine batch scheduling to minimize the weighted number of late jobs. https://doi.org/10.1007/bf01303431
    94-/
    95def p9_r0 (R : Reading F) : Prop :=
    96 InP (R.at p9)
    97
    98/-- `1|s-batch|ΣwjUj`: is in Ppseudo.
    99
    100Brucker, P. and Kovalyov, M.Y. (1996). Single machine batch scheduling to minimize the weighted number of late jobs. https://doi.org/10.1007/bf01303431
    101-/
    102def p10_r0 (R : Reading F) : Prop :=
    103 PseudoPoly (R.at p10)
    104
    105/-- `1|s-batch|ΣwjUj`: is NP-hard.
    106
    107Karp, R.M. (1972). Reducibility among combinatorial problems. https://doi.org/10.1007/978-1-4684-2001-2_9
    108-/
    109def p10_r1 (R : Reading F) : Prop :=
    110 NPHard (R.at p10)
    111
    112/-- `1|s-batch|ΣCj`: is in P.
    113
    114Coffman, Jr., E.G. and Yannakakis, M. and Magazine, M.J. and Santos, C. (1990). Batch sizing and job sequencing on a single machine. https://doi.org/10.1007/bf02248589
    115-/
    116def p11_r0 (R : Reading F) : Prop :=
    117 InP (R.at p11)
    118
    119/-- `1|pj=p;s-batch|ΣwjUj`: is in P.
    120
    121Hochbaum, D.S. and Landy, D. (1994). Scheduling with batching: minimizing the weighted number of tardy jobs. https://doi.org/10.1016/0167-6377(94)90063-9
    122-/
    123def p12_r0 (R : Reading F) : Prop :=
    124 InP (R.at p12)
    125
    126/-- `1|prec;s-batch|ΣCj`: is strongly NP-hard.
    127
    128Lawler, E.L. (1978). Sequencing jobs to minimize total weighted completion time subject to precedence constraints. https://doi.org/10.1016/s0167-5060(08)70323-6
    129-/
    130def p13_r0 (R : Reading F) : Prop :=
    131 StronglyNPHard (R.at p13)
    132
    133/-- `1|prec;s-batch|ΣCj`: is strongly NP-hard.
    134
    135Lenstra, J.K. and Rinnooy Kan, A.H.G. (1978). Complexity of scheduling under precedence constraints. https://doi.org/10.1287/opre.26.1.22
    136-/
    137def p13_r1 (R : Reading F) : Prop :=
    138 StronglyNPHard (R.at p13)
    139
    140/-- `1|chains;pj=1;s-batch|ΣUj`: is strongly NP-hard.
    141
    142Lenstra, J.K. and Rinnooy Kan, A.H.G. (1980). Complexity results for scheduling chains on a single machine. https://doi.org/10.1016/0377-2217(80)90111-3
    143-/
    144def p14_r0 (R : Reading F) : Prop :=
    145 StronglyNPHard (R.at p14)
    146
    147/-- `1|s-batch;rj|Lmax`: is strongly NP-hard.
    148
    149Lenstra, J.K. and Rinnooy Kan, A.H.G. and Brucker, P. (1977). Complexity of machine scheduling problems. https://doi.org/10.1016/s0167-5060(08)70743-x
    150-/
    151def p15_r0 (R : Reading F) : Prop :=
    152 StronglyNPHard (R.at p15)
    153
    154/-- `1|s-batch;rj|ΣCj`: is strongly NP-hard.
    155
    156Lenstra, J.K. and Rinnooy Kan, A.H.G. and Brucker, P. (1977). Complexity of machine scheduling problems. https://doi.org/10.1016/s0167-5060(08)70743-x
    157-/
    158def p16_r0 (R : Reading F) : Prop :=
    159 StronglyNPHard (R.at p16)
    160
    161/-- `1|chains;pj=1;s-batch|ΣTj`: is strongly NP-hard.
    162
    163Leung, J.Y.-T. and Young, G.H. (1990). Minimizing total tardiness on a single machine with precedence constraints. https://doi.org/10.1287/ijoc.2.4.346
    164-/
    165def p17_r0 (R : Reading F) : Prop :=
    166 StronglyNPHard (R.at p17)
    167
    168/-- `1|prec;s-batch|Lmax`: is in P.
    169
    170Ng, C.T. and Cheng, T.C.E. and Yuan, J.J. (2002). A note on the single machine serial batching scheduling problem to minimize maximum lateness with precedence constraints. https://doi.org/10.1016/s0167-6377(01)00105-5
    171-/
    172def p18_r0 (R : Reading F) : Prop :=
    173 InP (R.at p18)
    174
    175/-- `1|s-batch(∞);rj|ΣwjUj`: is NP-hard.
    176
    177Hermelin, Danny and Mnich, Matthias and Omlor, Simon (2024). Serial batching to minimize the weighted number of tardy jobs. https://link.springer.com/article/10.1007/s10951-024-00818-9
    178-/
    179def p19_r0 (R : Reading F) : Prop :=
    180 NPHard (R.at p19)
    181
    182/-- `1|s-batch(∞);rj|ΣwjUj`, parameter #d+#p: is W[1]-hard.
    183
    184Hermelin, Danny and Mnich, Matthias and Omlor, Simon (2024). Serial batching to minimize the weighted number of tardy jobs. https://link.springer.com/article/10.1007/s10951-024-00818-9
    185-/
    186def p19_r1 (R : Reading F) : Prop :=
    187 WHard (R.at p19) 1 (tplus (lift (Batch.numD p19)) (lift (Batch.numP p19)))
    188
    189/-- `1|s-batch(∞);rj|ΣwjUj`, parameter #p+#r: is W[1]-hard.
    190
    191Hermelin, Danny and Mnich, Matthias and Omlor, Simon (2024). Serial batching to minimize the weighted number of tardy jobs. https://link.springer.com/article/10.1007/s10951-024-00818-9
    192-/
    193def p19_r2 (R : Reading F) : Prop :=
    194 WHard (R.at p19) 1 (tplus (lift (Batch.numP p19)) (lift (Batch.numR p19)))
    195
    196/-- `1|s-batch(∞);rj|ΣwjUj`, parameter #d+#p+#w: is in P.
    197
    198Hermelin, Danny and Mnich, Matthias and Omlor, Simon (2024). Serial batching to minimize the weighted number of tardy jobs. https://link.springer.com/article/10.1007/s10951-024-00818-9
    199
    200Note: in P for every fixed value.
    201-/
    202def p19_r3 (R : Reading F) : Prop :=
    203 InPFixed (R.at p19) (tplus (tplus (lift (Batch.numD p19)) (lift (Batch.numP p19))) (lift (Batch.numW p19)))
    204
    205/-- `1|s-batch(∞);rj|ΣwjUj`, parameter #p+#r+#w: is in P.
    206
    207Hermelin, Danny and Mnich, Matthias and Omlor, Simon (2024). Serial batching to minimize the weighted number of tardy jobs. https://link.springer.com/article/10.1007/s10951-024-00818-9
    208
    209Note: in P for every fixed value.
    210-/
    211def p19_r4 (R : Reading F) : Prop :=
    212 InPFixed (R.at p19) (tplus (tplus (lift (Batch.numP p19)) (lift (Batch.numR p19))) (lift (Batch.numW p19)))
    213
    214/-- `1|s-batch(∞)|ΣwjUj`, parameter #p: is in P.
    215
    216Hermelin, Danny and Mnich, Matthias and Omlor, Simon (2024). Serial batching to minimize the weighted number of tardy jobs. https://link.springer.com/article/10.1007/s10951-024-00818-9
    217
    218Note: in P for every fixed value.
    219-/
    220def p20_r0 (R : Reading F) : Prop :=
    221 InPFixed (R.at p20) (lift (Batch.numP p20))
    222
    223/-- `1|s-batch(∞)|ΣwjUj`, parameter #w: is in P.
    224
    225Hermelin, Danny and Mnich, Matthias and Omlor, Simon (2024). Serial batching to minimize the weighted number of tardy jobs. https://link.springer.com/article/10.1007/s10951-024-00818-9
    226
    227Note: in P for every fixed value.
    228-/
    229def p20_r1 (R : Reading F) : Prop :=
    230 InPFixed (R.at p20) (lift (Batch.numW p20))
    231
    232/-- `1|s-batch(∞)|ΣwjUj`, parameter #d+#p: is fixed parameter tractable.
    233
    234Hermelin, Danny and Mnich, Matthias and Omlor, Simon (2024). Serial batching to minimize the weighted number of tardy jobs. https://link.springer.com/article/10.1007/s10951-024-00818-9
    235-/
    236def p20_r2 (R : Reading F) : Prop :=
    237 IsFPT (R.at p20) (tplus (lift (Batch.numD p20)) (lift (Batch.numP p20)))
    238
    239/-- `1|s-batch(∞)|ΣwjUj`, parameter #d+#w: is fixed parameter tractable.
    240
    241Hermelin, Danny and Mnich, Matthias and Omlor, Simon (2024). Serial batching to minimize the weighted number of tardy jobs. https://link.springer.com/article/10.1007/s10951-024-00818-9
    242-/
    243def p20_r3 (R : Reading F) : Prop :=
    244 IsFPT (R.at p20) (tplus (lift (Batch.numD p20)) (lift (Batch.numW p20)))
    245
    246/-- `1|s-batch(b)|ΣwjUj`, parameter #d+#w: is fixed parameter tractable.
    247
    248Hermelin, Danny and Mnich, Matthias and Omlor, Simon (2024). Serial batching to minimize the weighted number of tardy jobs. https://link.springer.com/article/10.1007/s10951-024-00818-9
    249-/
    250def p21_r0 (R : Reading F) : Prop :=
    251 IsFPT (R.at p21) (tplus (lift (Batch.numD p21)) (lift (Batch.numW p21)))
    252
    253/-- `1|s-batch(b);rj|ΣwjUj`, parameter #d+#p+#r: is fixed parameter tractable.
    254
    255Hermelin, Danny and Mnich, Matthias and Omlor, Simon (2024). Serial batching to minimize the weighted number of tardy jobs. https://link.springer.com/article/10.1007/s10951-024-00818-9
    256-/
    257def p22_r0 (R : Reading F) : Prop :=
    258 IsFPT (R.at p22) (tplus (tplus (lift (Batch.numD p22)) (lift (Batch.numP p22))) (lift (Batch.numR p22)))
    259
    260end Lax434175.ZooSerialBatchingResults
    261

    Discussion

    Ask a question or add context. Endorsements and structured flags are kept in the review panel above.