While this submission is a draft, it cannot be used by other submissions.

Proof of `1|r_j|L_max is para-NP-hard for the largest and the number of processing times` (1st statement)

groundedproofs/Lax434175Proofs/SanityStrong.lean · lax-434175

What this proof establishes

Assuming the claims on the left, the claim on the right holds — checked by the archive's pipeline. Proof code is not displayed here.

Read the Lean proof on GitHub

Description

The reduction of Sanity.npHardrjLmaxSanity.npHard_rjLmax through the explicit maps of lax-391470, whose instances have every time at most 2727 times the number of jobs.