While this submission is a draft, it cannot be used by other submissions.

Proof of `Scheduling with operations` (5th statement)

groundedproofs/Lax434175Proofs/Operations.lean · lax-434175

What this proof establishes

no assumptions

Assuming the claims on the left, the claim on the right holds — checked by the archive's pipeline. Proof code is not displayed here.

Read the Lean proof on GitHub

Description

A machine-set value of parallel machines restricts the operations of a job alike, so it is read as a machine value of shops by repeating it for every operation.