While this submission is a draft, it cannot be used by other submissions.

Proof of `Interruption as a field of parallel-machine scheduling` (1st statement)

groundedproofs/Lax434175Proofs/Interruption.lean · lax-434175

What this proof establishes

no assumptions

Assuming the claims on the left, the claim on the right holds — checked by the archive's pipeline. Proof code is not displayed here.

Read the Lean proof on GitHub

Description

Two values are comparable only if they are equal.