Proof of `The Stacked Scheduling Instance` (1st statement)

groundedproofs/Lax391470Proofs/StackedNumbering.lean · lax-391470

What this proof establishes

Assuming the claims on the left, the claim on the right holds — checked by the archive's pipeline. Proof code is not displayed here.

Read the Lean proof on GitHub

In the paper

  • page 5 of this submission's paper

Description

The numbered auxiliary instance and its stacked instance are renumberings of the typed ones, for which the exchange argument of the source is carried out.