Proof of `Scheduling with two non-unit job lengths is NP-complete` (3rd statement)
What this proof establishes
Assuming the claims on the left, the claim on the right holds — checked by the archive's pipeline. Proof code is not displayed here.
Description
Compose Lemma 2's hardness with the reduction of Lemma 1.